Project 1 (half a mark for each part: You must show your working to receive full marks)

Polycorp is considering an investment in new plant of $3 million. The project will be financed with a loan of $2,000,000 which will be repaid over the next five years in equal annual end of year instalments at a rate if 9.5 percent pa. Assume straight-line depreciation over a five-year life, and no taxes. The projects cash flows before loan repayments and interest have been deducted are shown in the table below. Cost of capital is 14.5% pa (the required rate of return on the project). A salvage value of $200,000 is expected at the end of year five and is not included in the cash flows for year five below. Ignore taxes and inflation.

Year Year One Year Two Year Three Year Four Year Five
Cash Inflow 800,000 950,000 855,000 900,000 950,000

You are required to calculate:

(1) The annual loan repayment
(2) Loan repayment schedule showing principle and interest components
(3) NPV of the project
(4) the IRR of the project (your answer should include at least one manual trial to demonstrate that you understand the concept)
(5) AE, the annual equivalent for the project(AE or EAV)
(6) PB, the payback and discounted payback in years (to one decimal place)
(7) ARR, the accounting rate of return (net and gross)
(8) PI (present value index or profitability index)
(9) Is the project acceptable? Provide the decision rule for each of the methods above.
(10) Why or why not (provide a full explanation)?

Project 2
Polycorp Limited Steel Division is considering a proposal to purchase a new machine to manufacture a new product for a potential three year contract. The new machine will cost $1.15 million. The machine has an estimated life of three years for accounting and taxation purposes. Polycorp has elected to use the diminishing value method of depreciation. The contract will not continue beyond three years and the equipment estimated salvage value at the end of three years is $105,000. The tax rate is 29 percent and is payable in the year in which profit is earned. An investment allowance of twenty percent on the outlay is available. The cost of capital is 13.25%pa after tax.

Addition net working capital of $70,000 is required immediately for current assets to support the project. Assume that this amount is recovered at the end of the three year life of the project.

The new product will be charged $53,500 of allocated head office administration costs each year even though head office will not actually incur any extra costs (cash flows) to manage the project. This is in accordance with the firm’s policy of allocating all corporate overhead costs to divisions.

Extra marketing and administration cash outflows of $43,000 per year will be incurred by the Steel Division. These are tax deductible in the year that they are incurred.

An amount of $39,000 has been spent on a pilot study and market research for the new product. The projections provided here are based on this work.

Projected sales for the new product are 30,000 units at $125 per unit per year. Cash operating expenses are estimated to be 81 percent of sales (excludes marketing and administration, and head office items).

Except for initial outlays, assume cash flows occur at the end of each year (unless otherwise stated). Assume diminishing value depreciation for tax purposes.

Please use diminishing balance/reducing balance depreciation for tax purposes

Required
(a) Construct a table showing your calculations of net cash flow after tax. (Similar to that demonstrated in the notes and in class) {3 marks}
(b) Calculate the NPV. Is the project acceptable? Why or why not? {1 marks}
(c) Explain your calculation of relevant net cash flows after tax, justifying your selection of cash flows. Be sure to state clearly any assumptions made. {1 marks}

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more